Naples, FL · Mon–Fri 8am–5pm · Sat 10am–2pm
Send the plans. Get the scope, the date, and one finger to point at.
Prequalification documents on request, a quote from the plan set, and lead times that name their clock start — before you carry our number.
One vendor for product and labor.
Prequalification before bid documents
Ask for the vendor packet: legal entity and W-9, Collier License #26259 status, and a current certificate of insurance with additional-insured options. We send it before you send plans.
What to send
Plan set, finish schedule, specifications, cabinet elevations, appliance schedule, stair details, addenda, bid date, and the installation window. We do the takeoff from the drawings and tell you the assumptions.
What comes back
Labor and material separated by scope — manufacturer, SKU, quantity, freight, floor preparation and a moisture-remedy allowance — with exclusions listed and a quote expiration date.
A date with a defined clock
Every lead time names what starts it and what ends it. Material is estimated, then reserved, then manufacturer-confirmed; labor is tentative until it is held. We tell you which one you have.
What you actually get from us.
Quoted from the plans, run by one PM
The estimator who does the takeoff hands the job to one project manager who carries purchasing, site coordination, installers and punch. One name on the schedule.
Moisture protocol in writing
Every slab is moisture-tested before the flooring plan is approved — method, locations and results go in the file, with a remedy recommendation if it fails.
RIVA, supplied here
ProFloors is the Southwest Florida supplier for RIVA. Stocked and made-to-order ranges are listed below with their clock.
Dates you can quote a client.
Planned lead times on the lines you'll spec most — sent before you commit, so the schedule never slips on you.
- RIVA Spain — stockedRIVA — stocked colors and widths1–2 weeks after written release against confirmed stock
- RIVA Spain — made to orderRIVA — wide plank made to order8–12 weeks after mill order acknowledgment
- Semi-custom cabinets — designSemi-custom cabinets — design and approval2–3 weeks after receipt of plans, elevations and appliance specs
- Semi-custom cabinets — manufactureFabuwood · UltraCraft · Omega10–12 weeks after manufacturer's accepted order (after approved drawings)
- Quick-ship carpet and stocked tileJ+J QuickShip · Stanton · DaltileQuoted per order — the quote states whether the period ends at shipment or Naples receipt
Whole-home hardwood, tile and cabinet scopes delivered in Naples — the same crews and the same project manager a GC gets.



How the work actually runs.
- 01
Prequalify
Request the vendor packet. Legal entity, W-9, license status and COI come back before the drawings go anywhere.
- 02
Send the plan set
Plans, finish schedule, specs, elevations, addenda and the bid date. We do the takeoff, quote labor and material by scope, and name the date and its clock.
- 03
Release and run
Material is reserved on written release; labor moves from tentative to held on a defined event. One project manager runs the job through punch and closeout.
Selected work for the general contractors we bid with.
Send the plans. Get a real date.
Request the vendor packet, then send the plan set and bid date. We quote labor and material by scope with a lead time that names its clock — and one project manager owns it through punch.
Trade pricing · one invoice · lead times with a defined clock





